Club Atlético de Madrid: 4.1 tonnes of CO2 to be absorbed per day thanks to stadium paint work
The paint work on the exterior façade of the Civitas Metropolitano (Madrid, ESP) home of Club Atlético de Madrid (LALIGA EA Sports) will make it possible to absorb 4.1 tonnes of CO2 every day, according to the club on 06/03/2024.
The renovation work will cover a surface area of 70,000 m2, which will be coated with 12,000 litres of paint supplied...
